Largest Data Centers in the World
Last updated:
The largest data center tracked on Data Center List is Hyperion in United States at 5.00 GW of IT power capacity (disclosed). This reflects our tracked coverage, not every data center on Earth.
Largest Disclosed Capacity
Facilities with a publicly reported power figure — no AI estimates. The most reliable ranking.
| # | Facility | Power | Operator | Status |
|---|---|---|---|---|
| 1 | Hyperion United States | 5.00 GW | — | Active |
| 2 | Childress AI Data Center Campus Childress, Texas, United States | 1.00 GW | — | Planned |
| 3 | Project Ares Northern Territory, Australia | 1.00 GW | — | Planned |
| 4 | Meta's 1 GW Alberta Campus Sturgeon County, Alberta, Canada | 1.00 GW | — | Planned |
| 5 | Gryfin Project Słupsk and Redzikowo, Pomeranian Voivodeship, Poland | 790 MW | — | Under Construction |
| 6 | Project Atlas South Whitehall Township, Pennsylvania, United States | 725 MW | — | Planned |
| 7 | Justified Data campus Hawesville, Kentucky, United States | 401 MW | — | Under Construction |
| 8 | Crusoe Load 2 Texas, United States | 260 MW | — | Planned |
| 9 | CDC Maddington Campus Australia | 200 MW | CDC | Active |
| 10 | Townsite Solar 2 Data Center Boulder City, Nevada, United States | 170 MW | — | Planned |
| 11 | Langenhorn Data Center Langenhorn, Schleswig-Holstein, Germany | 150 MW | — | Planned |
| 12 | Longum Nord Arendal, Norway | 150 MW | — | Planned |
| 13 | Vantage IAD1 Ashburn Ashburn, VA, United States | 120 MW | Vantage Data Centers | Active |
| 14 | EdgeCore PHX1 Phoenix Phoenix, AZ, United States | 100 MW | EdgeCore Internet Real Estate | Active |
| 15 | Global Switch London East London, United Kingdom | 87 MW | Global Switch | Active |
| 16 | CyrusOne Dallas I Dallas, TX, United States | 75 MW | CyrusOne | Active |
| 17 | Thames Valley Park Data Centre Reading, United Kingdom | 72 MW | — | Planned |
| 18 | Digital Realty DAL1 Dallas Dallas, TX, United States | 68 MW | Digital Realty | Active |
| 19 | Digital Realty ATL1 Atlanta Atlanta, GA, United States | 55 MW | Digital Realty | Active |
| 20 | NTT LON1 London Slough, NY, United Kingdom | 55 MW | NTT Global Data Centers | Active |
| 21 | Digital Realty FRA1 Frankfurt Frankfurt, Hesse, Germany | 48 MW | Digital Realty | Active |
| 22 | Equinix DC2 Ashburn Ashburn, VA, United States | 42 MW | Equinix | Active |
| 23 | Global Technical Realty London GB One United Kingdom | 41 MW | Global Technical Realty | Active |
| 24 | NTT AMS1 Amsterdam Amsterdam, North Holland, Netherlands | 40 MW | NTT Global Data Centers | Active |
| 25 | Equinix DC1 Ashburn Ashburn, VA, United States | 36 MW | Equinix | Active |
Largest Including AI Estimates
Broader view: adds facilities whose capacity is modeled rather than reported. Rows tagged AI est. are estimates, not disclosures.
| # | Facility | Power | Operator | Status |
|---|---|---|---|---|
| 1 | Hyperion United States | 5.00 GW | — | Active |
| 2 | Childress AI Data Center Campus Childress, Texas, United States | 1.00 GW | — | Planned |
| 3 | Project Ares Northern Territory, Australia | 1.00 GW | — | Planned |
| 4 | Meta's 1 GW Alberta Campus Sturgeon County, Alberta, Canada | 1.00 GW | — | Planned |
| 5 | Gryfin Project Słupsk and Redzikowo, Pomeranian Voivodeship, Poland | 790 MW | — | Under Construction |
| 6 | Project Atlas South Whitehall Township, Pennsylvania, United States | 725 MW | — | Planned |
| 7 | Justified Data campus Hawesville, Kentucky, United States | 401 MW | — | Under Construction |
| 8 | Google Data Center Fredericia Denmark | 386 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | — | Active |
| 9 | Crusoe Load 2 Texas, United States | 260 MW | — | Planned |
| 10 | Digital Realty IAD (43881 Devin Shafron) Ashburn, VA, United States | 215 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Digital Realty | Active |
| 11 | CDC Maddington Campus Australia | 200 MW | CDC | Active |
| 12 | Vantage IAD2 Ashburn (Campus 2) Ashburn, VA, United States | 200 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Vantage Data Centers | Under Construction |
| 13 | Meta Henrico Data Center United States | 188 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | — | Active |
| 14 | Townsite Solar 2 Data Center Boulder City, Nevada, United States | 170 MW | — | Planned |
| 15 | Langenhorn Data Center Langenhorn, Schleswig-Holstein, Germany | 150 MW | — | Planned |
| 16 | Longum Nord Arendal, Norway | 150 MW | — | Planned |
| 17 | Vantage IAD1 Ashburn Ashburn, VA, United States | 120 MW | Vantage Data Centers | Active |
| 18 | CyrusOne Hamilton Hamilton, OH, United States | 116 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | CyrusOne Inc. | Active |
| 19 | EdgeCore PHX1 Phoenix Phoenix, AZ, United States | 100 MW | EdgeCore Internet Real Estate | Active |
| 20 | Equinix CU1/CU2/CU3/CU4 - Culpeper Culpeper, VA, United States | 98 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Equinix | Active |
| 21 | Hetzner Online FSN1 (Falkenstein) Falkenstein, Saxony, Germany | 97 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Hetzner Online GmbH | Active |
| 22 | DataBank Phoenix (PHX2) Phoenix, AZ, United States | 95 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | DataBank, Ltd. | Active |
| 23 | Gagnaver Verne Global í Reykjanesbæ Iceland | 90 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | — | Active |
| 24 | Global Switch London East London, United Kingdom | 87 MW | Global Switch | Active |
| 25 | CyrusOne Dallas I Dallas, TX, United States | 75 MW | CyrusOne | Active |
| 26 | Thames Valley Park Data Centre Reading, United Kingdom | 72 MW | — | Planned |
| 27 | Flexential - Nashville/Brentwood (NAS01/04) Brentwood, TN, United States | 72 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Flexential Corp. | Active |
| 28 | Digital Realty DAL1 Dallas Dallas, TX, United States | 68 MW | Digital Realty | Active |
| 29 | Iron Mountain Data Center - New Jersey (NJE-1) Edison, NJ, United States | 62 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Iron Mountain Data Centers | Active |
| 30 | Telehouse - London (Docklands North Two) London, United Kingdom | 59 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Telehouse - Global Data Centers | Active |
| 31 | ICE02 Reykjanesbæ, Iceland | 58 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Advania Ísland ehf. | Active |
| 32 | Digital Realty ATL1 Atlanta Atlanta, GA, United States | 55 MW | Digital Realty | Active |
| 33 | NTT LON1 London Slough, NY, United Kingdom | 55 MW | NTT Global Data Centers | Active |
| 34 | QTS Atlanta-Metro (ATL1) Atlanta, GA, United States | 54 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | QTS Realty Trust, Inc. | Active |
| 35 | Africa Data Centres, Johannesburg JHB2, South Africa Samrand, Gauteng, South Africa | 53 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Africa Data Centres | Active |
| 36 | Digital Realty IAD (43830 Devin Shafron) Ashburn, VA, United States | 52 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Digital Realty | Active |
| 37 | Vantage Data Centers (QC2) Quebec, QC, Canada | 51 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Vantage Data Centers | Active |
| 38 | Digital Realty FRA1 Frankfurt Frankfurt, Hesse, Germany | 48 MW | Digital Realty | Active |
| 39 | Meta Odense Data Center Denmark | 45 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | — | Active |
| 40 | QTS Eemshaven (EEM1) Eemshaven, Netherlands | 45 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | QTS Realty Trust, Inc. | Active |
| 41 | Equinix DC2 Ashburn Ashburn, VA, United States | 42 MW | Equinix | Active |
| 42 | RC-Facility Ashburn, VA, United States | 41 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Rootcloud LLC | Active |
| 43 | Global Technical Realty London GB One United Kingdom | 41 MW | Global Technical Realty | Active |
| 44 | NTT AMS1 Amsterdam Amsterdam, North Holland, Netherlands | 40 MW | NTT Global Data Centers | Active |
| 45 | Aligned Phoenix (PHX-01) Phoenix, AZ, United States | 39 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | Aligned Data Centers | Active |
| 46 | CyrusOne Austin (Met 3) Austin, TX, United States | 38 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | CyrusOne Inc. | Active |
| 47 | noris network datacenter.de NBG6 Nuremberg, Bavaria, Germany | 37 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | noris network AG | Active |
| 48 | CyrusOne Aurora I Aurora, IL, United States | 36 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | CyrusOne Inc. | Active |
| 49 | Equinix DC1 Ashburn Ashburn, VA, United States | 36 MW | Equinix | Active |
| 50 | ColoCrossing CHI1 Elk Grove Village, IL, United States | 35 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published. | ColoCrossing | Active |
Frequently Asked Questions
What is the largest data center in the world?
Among the facilities Data Center List tracks, the largest is Hyperion in United States at 5.00 GW of IT power capacity (publicly disclosed). This reflects our tracked coverage, not a claim of global completeness — many large facilities never publish capacity figures.
What is the largest data center with a publicly disclosed capacity?
The largest facility with a publicly disclosed (non-estimated) power figure in our dataset is Hyperion in United States at 5.00 GW. This is a measured/reported figure, not a model estimate.
How does Data Center List rank data centers by size?
We rank by IT power capacity in megawatts (MW), the standard industry measure of a facility's compute capacity — not building square footage. Rankings are split into two lists: facilities with a publicly disclosed capacity figure, and a broader list that also includes AI-estimated capacity (flagged with an 'AI est.' badge) for facilities that don't publish numbers.
Are AI-estimated data center capacities accurate?
AI estimates are modeled from published research (industry power-density studies, operator disclosures for comparable facilities) calibrated to each facility's known attributes, and are always flagged with an 'AI est.' badge. They're directional, not measured — treat the 'Largest disclosed capacity' list as the more reliable ranking, and estimates as an illustrative, broader view.