Childress AI Data Center Campus
Childress, Texas, United States
1000MWIT Capacity
11.4Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
66.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Childress AI Data Center Campus is a 1000 MW data center in Childress, Texas, United States, currently planned. Estimated water use is about 11,412,230 gal/day.
Crusoe and Lancium announced plans in July 2026 for a 1GW AI data center campus in Childress, Childress County, Texas.
Last updated: July 24, 2026
- IT Power Capacity
- 1000 MW
- Water Usage
- 11,412,230 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- Data Center Dynamics · retrieved 2026-07-15
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Childress AI Data Center Campus?
- Childress AI Data Center Campus is a 1000 MW data center in Childress, Texas, United States, currently planned. Estimated water use is about 11,412,230 gal/day.
- Where is Childress AI Data Center Campus located?
- Childress AI Data Center Campus is located in Childress, Texas, United States.
- How big is Childress AI Data Center Campus?
- Childress AI Data Center Campus has an IT power capacity of 1000 MW.
- Is Childress AI Data Center Campus operational?
- Childress AI Data Center Campus is currently planned. Milestone dates are sourced from public planning records as they become available.
- How much water does Childress AI Data Center Campus use?
- Childress AI Data Center Campus has an estimated water use of about 11,412,230 gallons per day.