Townsite Solar 2 Data Center
Boulder City, Nevada, United States
170MWIT Capacity
1.9Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
59.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Townsite Solar 2 Data Center is a 170 MW data center in Boulder City, Nevada, United States, currently planned. Estimated water use is about 1,940,079 gal/day.
Townsite Solar 2, LLC is planning a 170MW data center campus in Boulder, Nevada, with land moving from city-owned to federal control; completion is targeted as soon as 2027.
Last updated: July 24, 2026
- IT Power Capacity
- 170 MW
- Water Usage
- 1,940,079 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- Data Center Dynamics · retrieved 2026-07-08
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Townsite Solar 2 Data Center?
- Townsite Solar 2 Data Center is a 170 MW data center in Boulder City, Nevada, United States, currently planned. Estimated water use is about 1,940,079 gal/day.
- Where is Townsite Solar 2 Data Center located?
- Townsite Solar 2 Data Center is located in Boulder City, Nevada, United States.
- How big is Townsite Solar 2 Data Center?
- Townsite Solar 2 Data Center has an IT power capacity of 170 MW.
- Is Townsite Solar 2 Data Center operational?
- Townsite Solar 2 Data Center is currently planned. Milestone dates are sourced from public planning records as they become available.
- How much water does Townsite Solar 2 Data Center use?
- Townsite Solar 2 Data Center has an estimated water use of about 1,940,079 gallons per day.