Vantage IAD2 Ashburn (Campus 2)
Ashburn, Loudoun County, VA, United States
Operated by Vantage Data Centers
200MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
2.3Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
44.2dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
1.5miAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.To Residential
Vantage Data CentersOperator
Est. completion: December 2025
About this facility
Vantage IAD2 Ashburn (Campus 2) is a 200 MW (est.) data center in Ashburn, VA, United States operated by Vantage Data Centers, currently under construction. Estimated completion is December 2025. Estimated water use is about 2,282,446 gal/day.
Vantage IAD2 expands the Ashburn campus with a massive hyperscale build targeting AI and cloud workloads.
Last updated: August 14, 2026
- IT Power Capacity
- 200 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.· planning_permit
- Water Usage
- 2,282,446 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- I-2
- Distance to Residential
- 1.5 miAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- County / District
- Loudoun County
- Region
- Northern Virginia
Sources
- Loudoun County Planning Records · retrieved 2025-06-01
- AI Estimate · retrieved 2026-08-14
Frequently asked questions
- What is Vantage IAD2 Ashburn (Campus 2)?
- Vantage IAD2 Ashburn (Campus 2) is a 200 MW (est.) data center in Ashburn, VA, United States operated by Vantage Data Centers, currently under construction. Estimated completion is December 2025. Estimated water use is about 2,282,446 gal/day.
- Where is Vantage IAD2 Ashburn (Campus 2) located?
- Vantage IAD2 Ashburn (Campus 2) is located in Ashburn, Loudoun County, VA, United States.
- Who operates Vantage IAD2 Ashburn (Campus 2)?
- Vantage IAD2 Ashburn (Campus 2) is operated by Vantage Data Centers.
- How big is Vantage IAD2 Ashburn (Campus 2)?
- Vantage IAD2 Ashburn (Campus 2) has an IT power capacity of 200 MW. This figure is estimated.
- When will Vantage IAD2 Ashburn (Campus 2) be completed?
- Vantage IAD2 Ashburn (Campus 2) is under construction, with an estimated completion of December 2025.
- How much water does Vantage IAD2 Ashburn (Campus 2) use?
- Vantage IAD2 Ashburn (Campus 2) has an estimated water use of about 2,282,446 gallons per day.