
Vantage IAD2 Ashburn (Campus 2)
Ashburn, Loudoun County, VA, United States
More data centers in Virginia →
Operated by Vantage Data Centers
200MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
2.3Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
44.2dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
1.5miAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.To Residential
Vantage Data CentersOperator
Est. completion: December 2025
About this facility
Vantage IAD2 Ashburn (Campus 2) is a 200 MW (est.) data center in Ashburn, VA, United States operated by Vantage Data Centers, currently under construction. Estimated completion is December 2025. Estimated water use is about 2,282,446 gal/day.
Vantage IAD2 expands the Ashburn campus with a massive hyperscale build targeting AI and cloud workloads.
Last updated: November 3, 2026
- IT Power Capacity
- 200 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.· planning_permit
- Water Usage
- 2,282,446 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- I-2
- Distance to Residential
- 1.5 miAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- County / District
- Loudoun County
- Region
- Northern Virginia
Sources
- Loudoun County Planning Records · retrieved 2025-06-01
- AI Estimate · retrieved 2026-11-03
Frequently asked questions
- What is Vantage IAD2 Ashburn (Campus 2)?
- Vantage IAD2 Ashburn (Campus 2) is a 200 MW (est.) data center in Ashburn, VA, United States operated by Vantage Data Centers, currently under construction. Estimated completion is December 2025. Estimated water use is about 2,282,446 gal/day.
- Where is Vantage IAD2 Ashburn (Campus 2) located?
- Vantage IAD2 Ashburn (Campus 2) is located in Ashburn, Loudoun County, VA, United States.
- Who operates Vantage IAD2 Ashburn (Campus 2)?
- Vantage IAD2 Ashburn (Campus 2) is operated by Vantage Data Centers.
- How big is Vantage IAD2 Ashburn (Campus 2)?
- Vantage IAD2 Ashburn (Campus 2) has an IT power capacity of 200 MW. This figure is estimated.
- When will Vantage IAD2 Ashburn (Campus 2) be completed?
- Vantage IAD2 Ashburn (Campus 2) is under construction, with an estimated completion of December 2025.
- How much water does Vantage IAD2 Ashburn (Campus 2) use?
- Vantage IAD2 Ashburn (Campus 2) has an estimated water use of about 2,282,446 gallons per day.