Project Apollo
Macquarie Park, New South Wales, Australia
135MWIT Capacity
1.5Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
58.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Project Apollo is a 135 MW data center in Macquarie Park, New South Wales, Australia, currently planned. Estimated water use is about 1,540,651 gal/day.
Goodman Group's Project Apollo, a 135MW data center at 4-10 Talavera Road, Macquarie Park in northern Sydney, NSW, Australia, has received planning approval with an estimated AU$1.4 billion ($1bn) construction cost.
Last updated: September 8, 2026
- IT Power Capacity
- 135 MW
- Water Usage
- 1,540,651 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- Data Center Dynamics · retrieved 2026-09-07
- AI Estimate · retrieved 2026-09-08
Frequently asked questions
- What is Project Apollo?
- Project Apollo is a 135 MW data center in Macquarie Park, New South Wales, Australia, currently planned. Estimated water use is about 1,540,651 gal/day.
- Where is Project Apollo located?
- Project Apollo is located in Macquarie Park, New South Wales, Australia.
- How big is Project Apollo?
- Project Apollo has an IT power capacity of 135 MW.
- Is Project Apollo operational?
- Project Apollo is currently planned. Milestone dates are sourced from public planning records as they become available.
- How much water does Project Apollo use?
- Project Apollo has an estimated water use of about 1,540,651 gallons per day.