Project Phoenix
Shippingport, Pennsylvania, United States
2000MWIT Capacity
22.8Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
69.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Project Phoenix is a 2000 MW data center in Shippingport, Pennsylvania, United States, currently under construction. Estimated water use is about 22,824,461 gal/day.
Aligned Data Centers broke ground on Project Phoenix, a 2GW data center campus in Shippingport, Pennsylvania.
Last updated: September 23, 2026
- IT Power Capacity
- 2000 MW
- Water Usage
- 22,824,461 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- Data Center Dynamics · retrieved 2026-09-17
- AI Estimate · retrieved 2026-09-23
Frequently asked questions
- What is Project Phoenix?
- Project Phoenix is a 2000 MW data center in Shippingport, Pennsylvania, United States, currently under construction. Estimated water use is about 22,824,461 gal/day.
- Where is Project Phoenix located?
- Project Phoenix is located in Shippingport, Pennsylvania, United States.
- How big is Project Phoenix?
- Project Phoenix has an IT power capacity of 2000 MW.
- Is Project Phoenix operational?
- Project Phoenix is currently under construction. Milestone dates are sourced from public planning records as they become available.
- How much water does Project Phoenix use?
- Project Phoenix has an estimated water use of about 22,824,461 gallons per day.