Crusoe Load 2
Texas, United States
260MWIT Capacity
3.0Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
60.9dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Crusoe Load 2 is a 260 MW data center in Texas, United States, currently planned. Estimated water use is about 2,967,180 gal/day.
Crusoe and Ensign Infrastructure have proposed 'Crusoe Load 2,' a 260 MW AI data center to be sited behind the existing 265.5 MW Goodnight 1 wind farm in Armstrong County, Texas.
Last updated: July 24, 2026
- IT Power Capacity
- 260 MW
- Water Usage
- 2,967,180 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- DataCenterKnowledge · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Crusoe Load 2?
- Crusoe Load 2 is a 260 MW data center in Texas, United States, currently planned. Estimated water use is about 2,967,180 gal/day.
- Where is Crusoe Load 2 located?
- Crusoe Load 2 is located in Texas, United States.
- How big is Crusoe Load 2?
- Crusoe Load 2 has an IT power capacity of 260 MW.
- Is Crusoe Load 2 operational?
- Crusoe Load 2 is currently planned. Milestone dates are sourced from public planning records as they become available.
- How much water does Crusoe Load 2 use?
- Crusoe Load 2 has an estimated water use of about 2,967,180 gallons per day.