Crusoe Load 2

Texas, United States

Planned
260MWIT Capacity
3.0Mgal/dayAI est.Water
60.9dB(A)AI est.Est. Noise

About this facility

Crusoe Load 2 is a 260 MW data center in Texas, United States, currently planned. Estimated water use is about 2,967,180 gal/day.

Crusoe and Ensign Infrastructure have proposed 'Crusoe Load 2,' a 260 MW AI data center to be sited behind the existing 265.5 MW Goodnight 1 wind farm in Armstrong County, Texas.

Last updated: July 24, 2026

IT Power Capacity
260 MW
Water Usage
2,967,180 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is Crusoe Load 2?
Crusoe Load 2 is a 260 MW data center in Texas, United States, currently planned. Estimated water use is about 2,967,180 gal/day.
Where is Crusoe Load 2 located?
Crusoe Load 2 is located in Texas, United States.
How big is Crusoe Load 2?
Crusoe Load 2 has an IT power capacity of 260 MW.
Is Crusoe Load 2 operational?
Crusoe Load 2 is currently planned. Milestone dates are sourced from public planning records as they become available.
How much water does Crusoe Load 2 use?
Crusoe Load 2 has an estimated water use of about 2,967,180 gallons per day.

Data for Crusoe Load 2 sourced from DataCenterKnowledge, AI Estimate. Values marked est. are estimates.

← Back to explore