Meta's 1 GW Alberta Campus
Sturgeon County, Alberta, Canada
1000MWIT Capacity
11.4Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
66.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Meta's 1 GW Alberta Campus is a 1000 MW data center in Sturgeon County, Alberta, Canada, currently planned. Estimated water use is about 11,412,230 gal/day.
Meta is building its first Canadian data center, a 1 GW AI campus in Sturgeon County, Alberta, representing an investment of more than US$9 billion (roughly C$13 billion).
Last updated: July 24, 2026
- IT Power Capacity
- 1000 MW
- Water Usage
- 11,412,230 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- DataCenterKnowledge · retrieved 2026-07-09
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Meta's 1 GW Alberta Campus?
- Meta's 1 GW Alberta Campus is a 1000 MW data center in Sturgeon County, Alberta, Canada, currently planned. Estimated water use is about 11,412,230 gal/day.
- Where is Meta's 1 GW Alberta Campus located?
- Meta's 1 GW Alberta Campus is located in Sturgeon County, Alberta, Canada.
- How big is Meta's 1 GW Alberta Campus?
- Meta's 1 GW Alberta Campus has an IT power capacity of 1000 MW.
- Is Meta's 1 GW Alberta Campus operational?
- Meta's 1 GW Alberta Campus is currently planned. Milestone dates are sourced from public planning records as they become available.
- How much water does Meta's 1 GW Alberta Campus use?
- Meta's 1 GW Alberta Campus has an estimated water use of about 11,412,230 gallons per day.