Justified Data campus
Hawesville, Kentucky, United States
401MWIT Capacity
4.6Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
62.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Justified Data campus is a 401 MW data center in Hawesville, Kentucky, United States, currently under construction. Estimated water use is about 4,576,304 gal/day.
TeraWulf's Justified Data campus in Hawesville, Kentucky is being developed in phases and will have up to 401MW of IT capacity once completed, with an estimated completion of early 2028; Anthropic has signed a $1.9bn 20-year lease at the site.
Last updated: July 24, 2026
- IT Power Capacity
- 401 MW
- Water Usage
- 4,576,304 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- Data Center Dynamics · retrieved 2026-07-06
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Justified Data campus?
- Justified Data campus is a 401 MW data center in Hawesville, Kentucky, United States, currently under construction. Estimated water use is about 4,576,304 gal/day.
- Where is Justified Data campus located?
- Justified Data campus is located in Hawesville, Kentucky, United States.
- How big is Justified Data campus?
- Justified Data campus has an IT power capacity of 401 MW.
- Is Justified Data campus operational?
- Justified Data campus is currently under construction. Milestone dates are sourced from public planning records as they become available.
- How much water does Justified Data campus use?
- Justified Data campus has an estimated water use of about 4,576,304 gallons per day.