Gryfin Project
Słupsk and Redzikowo, Pomeranian Voivodeship, Poland
790MWIT Capacity
9.0Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
65.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Gryfin Project is a 790 MW data center in Słupsk and Redzikowo, Pomeranian Voivodeship, Poland, currently under construction. Estimated water use is about 9,015,662 gal/day.
Twenty20 Energy's Gryfin Project comprises data centers planned for the towns of Słupsk and Redzikowo in Poland's Pomeranian Voivodeship, with construction beginning in 2026 and staged rollout reaching up to 790MW of compute capacity by 2030 (50MW expected operational by 2028).
Last updated: July 24, 2026
- IT Power Capacity
- 790 MW
- Water Usage
- 9,015,662 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- Data Center Dynamics · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Gryfin Project?
- Gryfin Project is a 790 MW data center in Słupsk and Redzikowo, Pomeranian Voivodeship, Poland, currently under construction. Estimated water use is about 9,015,662 gal/day.
- Where is Gryfin Project located?
- Gryfin Project is located in Słupsk and Redzikowo, Pomeranian Voivodeship, Poland.
- How big is Gryfin Project?
- Gryfin Project has an IT power capacity of 790 MW.
- Is Gryfin Project operational?
- Gryfin Project is currently under construction. Milestone dates are sourced from public planning records as they become available.
- How much water does Gryfin Project use?
- Gryfin Project has an estimated water use of about 9,015,662 gallons per day.