Saunderton campus
Saunderton, Buckinghamshire, United Kingdom
78MWIT Capacity
890Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
55.7dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Saunderton campus is a 78 MW data center in Saunderton, Buckinghamshire, United Kingdom, currently under construction. Estimated water use is about 890,154 gal/day.
Virtus Data Centres is continuing construction of its 78MW Saunderton campus in Buckinghamshire, UK, part of a UK/European expansion backed by £2.45bn in new financing, with completion targeted for Q2 2026.
Last updated: September 28, 2026
- IT Power Capacity
- 78 MW
- Water Usage
- 890,154 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- Data Centre Review · retrieved 2026-09-24
- AI Estimate · retrieved 2026-09-28
Frequently asked questions
- What is Saunderton campus?
- Saunderton campus is a 78 MW data center in Saunderton, Buckinghamshire, United Kingdom, currently under construction. Estimated water use is about 890,154 gal/day.
- Where is Saunderton campus located?
- Saunderton campus is located in Saunderton, Buckinghamshire, United Kingdom.
- How big is Saunderton campus?
- Saunderton campus has an IT power capacity of 78 MW.
- Is Saunderton campus operational?
- Saunderton campus is currently under construction. Milestone dates are sourced from public planning records as they become available.
- How much water does Saunderton campus use?
- Saunderton campus has an estimated water use of about 890,154 gallons per day.