Data Center List

Discover, analyze, and understand the impact of data centers worldwide.

Explore

  • Explore map
  • Browse data centers
  • Operators
  • Add a data center

Top markets

  • Northern Virginia
  • Dublin
  • London
  • Frankfurt
  • Amsterdam
  • Paris

By status

  • Operational
  • Planned
  • Under construction

Stats & Research

  • Stats & research
  • Insights
  • Largest data centers
  • Water usage
  • Power consumption
  • Noise levels
  • Jobs created

Resources

  • Data center jobs
  • Sitemap
  • Sign in
  • Terms & data use

© 2026 Data Center List

Data from PeeringDB, OpenStreetMap, Wikidata & public planning records. Values marked est. are estimates.

Data Center List
ExploreData CentersOperatorsNear MeJobs
+ Add Data CenterSign in

Browse Data Centers

6072 facilities worldwide

6072 facilities

PowerNameStatus
Equinix logo

Equinix SP4 - São Paulo

Equinix · Barueri, SP, Brazil

7.716 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
CyrusOne Inc. logo

CyrusOne San Antonio

CyrusOne Inc. · San Antonio, TX, United States

7.701 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
DA

DataPipe Silicon Valley One

DataPipe, Inc. · San Jose, CA, United States

7.664 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Centersquare logo

Centersquare Toronto (YYZ2)

Centersquare · Markham, ON, Canada

7.643 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
VPLS logo

Evocative EWR1

VPLS · Secaucus, NJ, United States

7.605 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
NC

NCAR-Wyoming Supercomputing Center

United States

7.592 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
DA

DataCenter.BZ - Worthington-Columbus

DataCenter.BZ, LLC · Worthington, OH, United States

7.519 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
DATA4 s.a r.l logo

Data 4 Warszawy

DATA4 s.a r.l · Jawczyce,, Poland

7.495 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
CoreSite logo

CoreSite - Los Angeles (LA2)

CoreSite · Los Angeles, CA, United States

7.464 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
CtrlS Datacenters Ltd logo

CtrlS Mumbai DC2

CtrlS Datacenters Ltd · Mumbai, Maharashtra, India

7.414 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Angola Cables logo

Angola Cables

Angola Cables · Fortaleza, CE, Brazil

7.354 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
MERLIN Edged logo

MERLIN Edged BIL03 - Bilbao-Arasur

MERLIN Edged · Rivabellosa, Álava, Spain

7.348 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Centersquare logo

Centersquare Tampa (TPA1)

Centersquare · Tampa, FL, United States

7.328 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Flexential Corp. logo

Flexential - Portland/Hillsboro 4 (PDX04)

Flexential Corp. · Hillsboro, OR, United States

7.315 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Towngas Telecommunications Co., Ltd. logo

TGT Hong Kong Data Centre 2

Towngas Telecommunications Co., Ltd. · Hong Kong, Hong Kong SAR China

7.301 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Colt Technology Services Group logo

COLT DC Paris SouthWest

Colt Technology Services Group · Paris, France

7.253 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Entel S.A. - EntelNet logo

SP4

Entel S.A. - EntelNet · São Paulo, SP, Brazil

7.232 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Digital Realty logo

Digital Realty IAD (1780 Business Center)

Digital Realty · Reston, VA, United States

7.228 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
China Mobile International Limited logo

China Mobile International - Frankfurt DC

China Mobile International Limited · Mörfelden-Walldorf, Hessen, Germany

7.219 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Centersquare logo

Centersquare New Jersey (EWR3)

Centersquare · Piscataway, NJ, United States

7.216 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Indiana University logo

Indiana University Data Center

Indiana University · Bloomington, IN, United States

7.082 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
NorthC Datacenters logo

NorthC Groningen 2

NorthC Datacenters · Groningen, TW, Netherlands

7.029 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Equinix logo

Equinix DX3 - Dubai

Equinix · Dubai, United Arab Emirates

7.02 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
NaviSite LLC logo

Navisite Redhill UK

NaviSite LLC · Redhill, Surrey, United Kingdom

7.018 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Page 13 of 253
← PrevNext →
💼

Powering the Future Starts with People

Discover careers in the data center industry.

Explore Jobs on Racks & Rows →

Job alerts are coming — join the waitlist

We're building job alerts for the data center industry. Leave your email and we'll tell you the moment they go live. Free, unsubscribe any time.

Browse by Region

  • Northern Virginia
  • Dublin
  • London
  • Frankfurt
  • Amsterdam
  • Paris

Filters