
9.379MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
107Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
46.5dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Bridge Data CentresOperator
About this facility
MY06 is a 9.379 MW (est.) data center in Kulai, Johor, Malaysia operated by Bridge Data Centres, currently operational. Estimated water use is about 107,035 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 9.379 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 107,035 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is MY06?
- MY06 is a 9.379 MW (est.) data center in Kulai, Johor, Malaysia operated by Bridge Data Centres, currently operational. Estimated water use is about 107,035 gal/day.
- Where is MY06 located?
- MY06 is located in Kulai, Johor, Malaysia.
- Who operates MY06?
- MY06 is operated by Bridge Data Centres.
- How big is MY06?
- MY06 has an IT power capacity of 9.379 MW. This figure is estimated.
- Is MY06 operational?
- Yes — MY06 is currently operational.
- How much water does MY06 use?
- MY06 has an estimated water use of about 107,035 gallons per day.