Bridge Data Centres logo

MY06

Kulai, Johor, Malaysia

Operated by Bridge Data Centres

Active
9.379MWAI est.IT Capacity
107Kgal/dayAI est.Water
46.5dB(A)AI est.Est. Noise
Bridge Data CentresOperator

About this facility

MY06 is a 9.379 MW (est.) data center in Kulai, Johor, Malaysia operated by Bridge Data Centres, currently operational. Estimated water use is about 107,035 gal/day.

Last updated: July 24, 2026

IT Power Capacity
9.379 MWAI est.
Water Usage
107,035 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is MY06?
MY06 is a 9.379 MW (est.) data center in Kulai, Johor, Malaysia operated by Bridge Data Centres, currently operational. Estimated water use is about 107,035 gal/day.
Where is MY06 located?
MY06 is located in Kulai, Johor, Malaysia.
Who operates MY06?
MY06 is operated by Bridge Data Centres.
How big is MY06?
MY06 has an IT power capacity of 9.379 MW. This figure is estimated.
Is MY06 operational?
Yes — MY06 is currently operational.
How much water does MY06 use?
MY06 has an estimated water use of about 107,035 gallons per day.

Data for MY06 sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore