
10.133MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
116Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
46.9dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Aphorio CarterOperator
About this facility
Aphorio Carter Trumbull Data Center is a 10.133 MW (est.) data center in Trumbull, CT, United States operated by Aphorio Carter, currently operational. Estimated water use is about 115,640 gal/day.
fka: Sentinal fka: Digital Realty HVN10
Last updated: July 24, 2026
- IT Power Capacity
- 10.133 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 115,640 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Aphorio Carter Trumbull Data Center?
- Aphorio Carter Trumbull Data Center is a 10.133 MW (est.) data center in Trumbull, CT, United States operated by Aphorio Carter, currently operational. Estimated water use is about 115,640 gal/day.
- Where is Aphorio Carter Trumbull Data Center located?
- Aphorio Carter Trumbull Data Center is located in Trumbull, CT, United States.
- Who operates Aphorio Carter Trumbull Data Center?
- Aphorio Carter Trumbull Data Center is operated by Aphorio Carter.
- How big is Aphorio Carter Trumbull Data Center?
- Aphorio Carter Trumbull Data Center has an IT power capacity of 10.133 MW. This figure is estimated.
- Is Aphorio Carter Trumbull Data Center operational?
- Yes — Aphorio Carter Trumbull Data Center is currently operational.
- How much water does Aphorio Carter Trumbull Data Center use?
- Aphorio Carter Trumbull Data Center has an estimated water use of about 115,640 gallons per day.