
9.554MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
109Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
46.6dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
CapitaLand Digital Holdings Pte Ltd.Operator
About this facility
Croydon is a 9.554 MW (est.) data center in Croydon, Sutton, United Kingdom operated by CapitaLand Digital Holdings Pte Ltd., currently operational. Estimated water use is about 109,032 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 9.554 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 109,032 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Croydon?
- Croydon is a 9.554 MW (est.) data center in Croydon, Sutton, United Kingdom operated by CapitaLand Digital Holdings Pte Ltd., currently operational. Estimated water use is about 109,032 gal/day.
- Where is Croydon located?
- Croydon is located in Croydon, Sutton, United Kingdom.
- Who operates Croydon?
- Croydon is operated by CapitaLand Digital Holdings Pte Ltd..
- How big is Croydon?
- Croydon has an IT power capacity of 9.554 MW. This figure is estimated.
- Is Croydon operational?
- Yes — Croydon is currently operational.
- How much water does Croydon use?
- Croydon has an estimated water use of about 109,032 gallons per day.