
9.694MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
111Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
46.7dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix CH1/CH2/CH4 - Chicago is a 9.694 MW (est.) data center in Chicago, IL, United States operated by Equinix, currently operational. Estimated water use is about 110,630 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 9.694 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 110,630 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix CH1/CH2/CH4 - Chicago?
- Equinix CH1/CH2/CH4 - Chicago is a 9.694 MW (est.) data center in Chicago, IL, United States operated by Equinix, currently operational. Estimated water use is about 110,630 gal/day.
- Where is Equinix CH1/CH2/CH4 - Chicago located?
- Equinix CH1/CH2/CH4 - Chicago is located in Chicago, IL, United States.
- Who operates Equinix CH1/CH2/CH4 - Chicago?
- Equinix CH1/CH2/CH4 - Chicago is operated by Equinix.
- How big is Equinix CH1/CH2/CH4 - Chicago?
- Equinix CH1/CH2/CH4 - Chicago has an IT power capacity of 9.694 MW. This figure is estimated.
- Is Equinix CH1/CH2/CH4 - Chicago operational?
- Yes — Equinix CH1/CH2/CH4 - Chicago is currently operational.
- How much water does Equinix CH1/CH2/CH4 - Chicago use?
- Equinix CH1/CH2/CH4 - Chicago has an estimated water use of about 110,630 gallons per day.