10.329MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
118Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
46.9dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
CyrusOne Inc.Operator
About this facility
CyrusOne Phoenix is a 10.329 MW (est.) data center in Phoenix, AZ, United States operated by CyrusOne Inc., currently operational. Estimated water use is about 117,877 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 10.329 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 117,877 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is CyrusOne Phoenix?
- CyrusOne Phoenix is a 10.329 MW (est.) data center in Phoenix, AZ, United States operated by CyrusOne Inc., currently operational. Estimated water use is about 117,877 gal/day.
- Where is CyrusOne Phoenix located?
- CyrusOne Phoenix is located in Phoenix, AZ, United States.
- Who operates CyrusOne Phoenix?
- CyrusOne Phoenix is operated by CyrusOne Inc..
- How big is CyrusOne Phoenix?
- CyrusOne Phoenix has an IT power capacity of 10.329 MW. This figure is estimated.
- Is CyrusOne Phoenix operational?
- Yes — CyrusOne Phoenix is currently operational.
- How much water does CyrusOne Phoenix use?
- CyrusOne Phoenix has an estimated water use of about 117,877 gallons per day.