Data Center List

Discover, analyze, and understand the impact of data centers worldwide.

Explore

  • Explore map
  • Browse data centers
  • Operators
  • Add a data center

Top markets

  • Northern Virginia
  • Dublin
  • London
  • Frankfurt
  • Amsterdam
  • Paris

By status

  • Operational
  • Planned
  • Under construction

Stats & Research

  • Stats & research
  • Insights
  • Largest data centers
  • Water usage
  • Power consumption
  • Noise levels
  • Jobs created

Resources

  • Data center jobs
  • Sitemap
  • Sign in
  • Terms & data use

© 2026 Data Center List

Data from PeeringDB, OpenStreetMap, Wikidata & public planning records. Values marked est. are estimates.

Data Center List
ExploreData CentersOperatorsNear MeJobs
+ Add Data CenterSign in

Browse Data Centers

360 facilities worldwide (filtered)

360 facilities matching filters

PowerNameStatus
LA

Langenhorn Data Center

Langenhorn, Schleswig-Holstein, Germany

150 MW ITHyperscale-class
Planned
Hetzner Online GmbH logo

Hetzner Online FSN1 (Falkenstein)

Hetzner Online GmbH · Falkenstein, Saxony, Germany

97.298 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Large facility
Active
Digital Realty logo

Digital Realty FRA1 Frankfurt

Digital Realty · Frankfurt, Hesse, Germany

48 MW ITLarge facility
Active
noris network AG logo

noris network datacenter.de NBG6

noris network AG · Nuremberg, Bavaria, Germany

36.563 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Large facility
Active
Hetzner Online GmbH logo

Hetzner Online NBG1 (Nuremberg)

Hetzner Online GmbH · Nuremberg, Mittelfranken, Germany

30.774 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Large facility
Active
Equinix logo

Equinix FR7 - Frankfurt, Gutleutstrasse

Equinix · Frankfurt, Germany

15.933 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
NTT DATA's Global Data Centers division logo

NTT Berlin 1 Data Center (BER1)

NTT DATA's Global Data Centers division · Berlin, Germany

13.17 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Equinix logo

Equinix FR4 - Frankfurt, West

Equinix · Frankfurt, Germany

8.212 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
China Mobile International Limited logo

China Mobile International - Frankfurt DC

China Mobile International Limited · Mörfelden-Walldorf, Hessen, Germany

7.219 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Telehouse - Global Data Centers logo

Telehouse - Frankfurt

Telehouse - Global Data Centers · Frankfurt, Germany

6.36 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
NTT DATA's Global Data Centers division logo

NTT Frankfurt 3 Data Center (FRA3)

NTT DATA's Global Data Centers division · Rüsselsheim, Hessen, Germany

6.306 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Global Switch logo

Global Switch Frankfurt

Global Switch · Frankfurt, Germany

5.867 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
NorthC Deutschland GmbH logo

NorthC Frankfurt 3

NorthC Deutschland GmbH · Frankfurt am Main, Germany

5.688 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Equinix logo

Equinix HH1 - Hamburg

Equinix · Hamburg, Germany

4.645 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
ITENOS GmbH logo

ITENOS Frankfurt (FRA2)

ITENOS GmbH · Frankfurt, Hessen, Germany

4.507 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Equinix logo

Equinix FR8 - Frankfurt, West

Equinix · Frankfurt, Germany

4.274 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
NTT DATA's Global Data Centers division logo

NTT Frankfurt 4 Data Center (FRA4)

NTT DATA's Global Data Centers division · Hattersheim am Main, Hessen, Germany

3.965 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
NorthC Deutschland GmbH logo

NorthC Munich 2

NorthC Deutschland GmbH · Munich, Germany

3.896 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Keppel Data Centres Holding Pte Ltd logo

Keppel Data Centres | maincubes Data Centre

Keppel Data Centres Holding Pte Ltd · Offenbach, Hessen, Germany

3.852 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
NorthC Deutschland GmbH logo

NorthC Hamburg

NorthC Deutschland GmbH · Hamburg, Germany

3.468 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
CyrusOne Inc. logo

CyrusOne Frankfurt 2

CyrusOne Inc. · Frankfurt, Germany

3.303 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Equinix logo

Equinix DU1 - Dusseldorf

Equinix · Düsseldorf, Germany

3.269 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Pfalzkom GmbH logo

Pfalzkom DCRN II

Pfalzkom GmbH · Mutterstadt, Germany

2.971 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Digital Realty logo

Digital Realty Frankfurt FRA29-32

Digital Realty · Frankfurt, Hessia, Germany

2.9 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Page 1 of 15
Next →
💼

Powering the Future Starts with People

Discover careers in the data center industry.

Explore Jobs on Racks & Rows →

Job alerts are coming — join the waitlist

We're building job alerts for the data center industry. Leave your email and we'll tell you the moment they go live. Free, unsubscribe any time.

Browse by Region

  • Northern Virginia
  • Dublin
  • London
  • Frankfurt
  • Amsterdam
  • Paris

Filters