
5.688MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
65Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
44.3dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
NorthC Deutschland GmbHOperator
About this facility
NorthC Frankfurt 3 is a 5.688 MW (est.) data center in Frankfurt am Main, Germany operated by NorthC Deutschland GmbH, currently operational. Estimated water use is about 64,913 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 5.688 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 64,913 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is NorthC Frankfurt 3?
- NorthC Frankfurt 3 is a 5.688 MW (est.) data center in Frankfurt am Main, Germany operated by NorthC Deutschland GmbH, currently operational. Estimated water use is about 64,913 gal/day.
- Where is NorthC Frankfurt 3 located?
- NorthC Frankfurt 3 is located in Frankfurt am Main, Germany.
- Who operates NorthC Frankfurt 3?
- NorthC Frankfurt 3 is operated by NorthC Deutschland GmbH.
- How big is NorthC Frankfurt 3?
- NorthC Frankfurt 3 has an IT power capacity of 5.688 MW. This figure is estimated.
- Is NorthC Frankfurt 3 operational?
- Yes — NorthC Frankfurt 3 is currently operational.
- How much water does NorthC Frankfurt 3 use?
- NorthC Frankfurt 3 has an estimated water use of about 64,913 gallons per day.