
3.303MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
38Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
42dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
CyrusOne Inc.Operator
About this facility
CyrusOne Frankfurt 2 is a 3.303 MW (est.) data center in Frankfurt, Germany operated by CyrusOne Inc., currently operational. Estimated water use is about 37,695 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 3.303 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 37,695 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is CyrusOne Frankfurt 2?
- CyrusOne Frankfurt 2 is a 3.303 MW (est.) data center in Frankfurt, Germany operated by CyrusOne Inc., currently operational. Estimated water use is about 37,695 gal/day.
- Where is CyrusOne Frankfurt 2 located?
- CyrusOne Frankfurt 2 is located in Frankfurt, Germany.
- Who operates CyrusOne Frankfurt 2?
- CyrusOne Frankfurt 2 is operated by CyrusOne Inc..
- How big is CyrusOne Frankfurt 2?
- CyrusOne Frankfurt 2 has an IT power capacity of 3.303 MW. This figure is estimated.
- Is CyrusOne Frankfurt 2 operational?
- Yes — CyrusOne Frankfurt 2 is currently operational.
- How much water does CyrusOne Frankfurt 2 use?
- CyrusOne Frankfurt 2 has an estimated water use of about 37,695 gallons per day.