
About this facility
Equinix FR8 - Frankfurt, West is a 4.274 MW (est.) data center in Frankfurt, Germany operated by Equinix, currently operational. Estimated water use is about 48,776 gal/day.
This facility is part of an Equinix Campus with diverse, sub-10km [Campus Cross Connects] (https://www.equinix.com/resources/data-sheets/cross-connects/) available to the following IBX's: [Frankfurt FR4] (https://www.peeringdb.com/fac/683) [Frankfurt FR6] (https://www.peeringdb.com/fac/4704) Additional connectivity within the metro using [Fibre Connect] (https://www.equinix.com/resources/data-sheets/fiber-connect) is available to the following IBX's: [Frankfurt FR5] (https://www.peeringdb.…
Last updated: July 24, 2026
- IT Power Capacity
- 4.274 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 48,776 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix FR8 - Frankfurt, West?
- Equinix FR8 - Frankfurt, West is a 4.274 MW (est.) data center in Frankfurt, Germany operated by Equinix, currently operational. Estimated water use is about 48,776 gal/day.
- Where is Equinix FR8 - Frankfurt, West located?
- Equinix FR8 - Frankfurt, West is located in Frankfurt, Germany.
- Who operates Equinix FR8 - Frankfurt, West?
- Equinix FR8 - Frankfurt, West is operated by Equinix.
- How big is Equinix FR8 - Frankfurt, West?
- Equinix FR8 - Frankfurt, West has an IT power capacity of 4.274 MW. This figure is estimated.
- Is Equinix FR8 - Frankfurt, West operational?
- Yes — Equinix FR8 - Frankfurt, West is currently operational.
- How much water does Equinix FR8 - Frankfurt, West use?
- Equinix FR8 - Frankfurt, West has an estimated water use of about 48,776 gallons per day.