Data Center List

Discover, analyze, and understand the impact of data centers worldwide.

Explore

  • Explore map
  • Browse data centers
  • Operators
  • Add a data center

Top markets

  • Northern Virginia
  • Dublin
  • London
  • Frankfurt
  • Amsterdam
  • Paris

By status

  • Operational
  • Planned
  • Under construction

Stats & Research

  • Stats & research
  • Insights
  • Largest data centers
  • Water usage
  • Power consumption
  • Noise levels
  • Jobs created

Resources

  • Data center jobs
  • Sitemap
  • Sign in
  • Terms & data use

© 2026 Data Center List

Data from PeeringDB, OpenStreetMap, Wikidata & public planning records. Values marked est. are estimates.

Data Center List
ExploreData CentersOperatorsNear MeJobs
+ Add Data CenterSign in

Browse Data Centers

6072 facilities worldwide

6072 facilities

PowerNameStatus
Stream Data Centers logo

Stream Data Centers - Houston I

Stream Data Centers · The Woodlands, TX, United States

9.491 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Bridge Data Centres logo

MY06

Bridge Data Centres · Kulai, Johor, Malaysia

9.379 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Markley Group, LLC logo

Markley Group Lowell

Markley Group, LLC · Lowell, MA, United States

9.28 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
3HCLOUD LLC logo

3HCloud - MIA-2

3HCLOUD LLC · Miami, FL, United States

9.236 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
DataBank, Ltd. logo

DataBank Dallas (DFW2)

DataBank, Ltd. · Richardson, TX, United States

9.208 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Equinix logo

Equinix SV4 - Silicon Valley, Sunnyvale

Equinix · Sunnyvale, CA, United States

9.194 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Cellnex Netherlands B.V. logo

Cellnex Datacenter Rotterdam

Cellnex Netherlands B.V. · Rotterdam, Netherlands

9.064 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Stream Data Centers logo

Stream Data Centers - Chicago I

Stream Data Centers · Elk Grove Village, IL, United States

9.053 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
EdgeConneX Inc. logo

EdgeConneX Chicago (EDCCHI02)

EdgeConneX Inc. · Elk Grove Village, IL, United States

9.021 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
CyrusOne Inc. logo

CyrusOne London 3

CyrusOne Inc. · Slough, England, United Kingdom

9 MW ITMid-size facility
Active
Sungard Availability Services logo

Sungard AS Philadelphia

Sungard Availability Services · Philadelphia, PA, United States

8.985 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
DI

Digital Realty LGW15

Digital Realty Trust · United Kingdom

8.963 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
K2 Data Centres logo

K2 DUB1

K2 Data Centres · Blanchardstown, Ireland

8.963 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Serverfarm logo

Serverfarm LAX1 Los Angeles

Serverfarm · El Segundo, CA, United States

8.956 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Verne Global logo

Verne Helsinki

Verne Global · Vantaa, Uusimaa, Finland

8.898 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
CyrusOne Inc. logo

CyrusOne London 1

CyrusOne Inc. · Slough, United Kingdom

8.72 MW ITMid-size facility
Active
CDC Data Centres logo

CDC Sydney EC4

CDC Data Centres · Eastern Creek, NSW, Australia

8.682 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Telstra Corporation Ltd logo

Telstra InfraCo - St Leonards Data Centre

Telstra Corporation Ltd · St Leonards, NSW, Australia

8.673 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Centersquare logo

Centersquare Dallas (DFW2)

Centersquare · Allen, TX, United States

8.614 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Digital Realty logo

Digital Realty IAD (44060 Digital Loudoun)

Digital Realty · Ashburn, VA, United States

8.603 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
DataBank, Ltd. logo

DataBank Minneapolis (MSP3)

DataBank, Ltd. · Brooklyn Park, MN, United States

8.599 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Digital Realty logo

Digital Realty LAX (2260 E El Segundo)

Digital Realty · El Segundo, CA, United States

8.52 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
EdgeCore Digital Infrastructure logo

EdgeCore Phoenix

EdgeCore Digital Infrastructure · Mesa, AZ, United States

8.49 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Teraco Data Environments Pty Ltd logo

Teraco Johannesburg Campus, South Africa

Teraco Data Environments Pty Ltd · Johannesburg, GP, South Africa

8.435 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Page 11 of 253
← PrevNext →
💼

Powering the Future Starts with People

Discover careers in the data center industry.

Explore Jobs on Racks & Rows →

Job alerts are coming — join the waitlist

We're building job alerts for the data center industry. Leave your email and we'll tell you the moment they go live. Free, unsubscribe any time.

Browse by Region

  • Northern Virginia
  • Dublin
  • London
  • Frankfurt
  • Amsterdam
  • Paris

Filters