NIMB
Bucharest, Romania
12MWIT Capacity
137Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
47.6dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
NIMB is a 12 MW data center in Bucharest, Romania, currently planned. Estimated water use is about 136,947 gal/day.
S+B Gruppe, an Austrian developer, has planning permission/building permit approval for NIMB, a planned 12MW Tier III-targeted data center near Bucharest’s Pipera metro station. It is to have about 3,400 sqm of white space and 6.7MW IT capacity, with operation/opening targeted between late 2027 and 2028; one report says final grid connection remains a delivery dependency.
Last updated: November 8, 2026
- IT Power Capacity
- 12 MW· research_agent
- Water Usage
- 136,947 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- sb-gruppe.at · retrieved 2026-11-07
- datacenterdynamics.com · retrieved 2026-11-07
- w.media · retrieved 2026-11-07
- data-central.co.uk · retrieved 2026-11-07
- AI Estimate · retrieved 2026-11-08
Frequently asked questions
- What is NIMB?
- NIMB is a 12 MW data center in Bucharest, Romania, currently planned. Estimated water use is about 136,947 gal/day.
- Where is NIMB located?
- NIMB is located in Bucharest, Romania.
- How big is NIMB?
- NIMB has an IT power capacity of 12 MW.
- Is NIMB operational?
- NIMB is currently planned. Milestone dates are sourced from public planning records as they become available.
- How much water does NIMB use?
- NIMB has an estimated water use of about 136,947 gallons per day.