
13.053MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
149Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
48dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
nLighten HQ BVOperator
About this facility
nLighten Liverpool LPL1 is a 13.053 MW (est.) data center in Wirral, Liverpool, United Kingdom operated by nLighten HQ BV, currently operational. Estimated water use is about 148,964 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 13.053 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 148,964 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- Wikidata · retrieved 2026-07-19
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is nLighten Liverpool LPL1?
- nLighten Liverpool LPL1 is a 13.053 MW (est.) data center in Wirral, Liverpool, United Kingdom operated by nLighten HQ BV, currently operational. Estimated water use is about 148,964 gal/day.
- Where is nLighten Liverpool LPL1 located?
- nLighten Liverpool LPL1 is located in Wirral, Liverpool, United Kingdom.
- Who operates nLighten Liverpool LPL1?
- nLighten Liverpool LPL1 is operated by nLighten HQ BV.
- How big is nLighten Liverpool LPL1?
- nLighten Liverpool LPL1 has an IT power capacity of 13.053 MW. This figure is estimated.
- Is nLighten Liverpool LPL1 operational?
- Yes — nLighten Liverpool LPL1 is currently operational.
- How much water does nLighten Liverpool LPL1 use?
- nLighten Liverpool LPL1 has an estimated water use of about 148,964 gallons per day.