
13.619MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
155Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
48.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Hurricane ElectricOperator
About this facility
Hurricane Electric Fremont 2 is a 13.619 MW (est.) data center in Fremont, CA, United States operated by Hurricane Electric, currently operational. Estimated water use is about 155,423 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 13.619 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 155,423 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Hurricane Electric Fremont 2?
- Hurricane Electric Fremont 2 is a 13.619 MW (est.) data center in Fremont, CA, United States operated by Hurricane Electric, currently operational. Estimated water use is about 155,423 gal/day.
- Where is Hurricane Electric Fremont 2 located?
- Hurricane Electric Fremont 2 is located in Fremont, CA, United States.
- Who operates Hurricane Electric Fremont 2?
- Hurricane Electric Fremont 2 is operated by Hurricane Electric.
- How big is Hurricane Electric Fremont 2?
- Hurricane Electric Fremont 2 has an IT power capacity of 13.619 MW. This figure is estimated.
- Is Hurricane Electric Fremont 2 operational?
- Yes — Hurricane Electric Fremont 2 is currently operational.
- How much water does Hurricane Electric Fremont 2 use?
- Hurricane Electric Fremont 2 has an estimated water use of about 155,423 gallons per day.