Data Center List

Discover, analyze, and understand the impact of data centers worldwide.

Explore

  • Explore map
  • Browse data centers
  • Operators
  • Add a data center

Top markets

  • Northern Virginia
  • Dublin
  • London
  • Frankfurt
  • Amsterdam
  • Paris

By status

  • Operational
  • Planned
  • Under construction

Stats & Research

  • Stats & research
  • Insights
  • Largest data centers
  • Water usage
  • Power consumption
  • Noise levels
  • Jobs created

Resources

  • Data center jobs
  • Sitemap
  • Sign in
  • Terms & data use

© 2026 Data Center List

Data from PeeringDB, OpenStreetMap, Wikidata & public planning records. Values marked est. are estimates.

Data Center List
ExploreData CentersOperatorsNear MeJobs
+ Add Data CenterSign in

Browse Data Centers

236 facilities worldwide (filtered)

236 facilities matching filters

PowerNameStatus
IN

Paris Digital Park

Interxion · France

32.292 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Large facility
Active
Equinix logo

Equinix PA1 Paris

Equinix · Paris, Île-de-France, France

25 MW ITLarge facility
Active
Equinix logo

Equinix BX1 - Bordeaux

Equinix · Bruges, Bordeaux, France

20.213 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Large facility
Active
Equinix logo

Equinix PA3 - Paris, Saint-Denis

Equinix · Paris, France

16.976 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
SC

OPCORE DC5

Scaleway · France

13.724 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Equinix logo

Equinix PA7 - Paris, Energy Park

Equinix · Paris, France

11.317 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
nLighten HQ BV logo

nLighten Paris PAR2

nLighten HQ BV · Aubervilliers, France

11.09 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
SC

OPCORE DC3

Scaleway · France

8.073 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Colt Technology Services Group logo

COLT DC Paris SouthWest

Colt Technology Services Group · Paris, France

7.253 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
EX

ex U-Boot-Bunker Martha

France

6.076 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Equinix logo

Equinix PA6 - Paris, Condorcet

Equinix · Paris, France

6.036 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
UltraEdge logo

UltraEdge Strasbourg

UltraEdge · Strasbourg, France

6.01 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Digital Realty logo

Digital Realty Paris PAR8

Digital Realty · La Courneuve, France

5.834 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Celeste SAS logo

Celeste Marilyn

Celeste SAS · Champs-sur-Marne, Île-de-France, France

5.33 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
SC

OPCORE DC2

Scaleway · France

4.44 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Cloudata logo

Cloudata

Cloudata · Bievres, Essonne, France

4.213 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
HELIANTIS SAS logo

HELIANTIS

HELIANTIS SAS · Pau, France

4.164 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Digital Realty logo

Digital Realty Marseille MRS1/2/3/4

Digital Realty · Marseille, France

4.149 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Global Switch logo

Global Switch Paris

Global Switch · Paris, France

3.869 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Penta C.V. logo

Penta Infra Paris PAR01

Penta C.V. · Lognes, Seine-et-Marne, France

3.857 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Digital Realty logo

Digital Realty Paris PAR7

Digital Realty · Paris, France

3.634 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Digital Realty logo

Digital Realty Paris PAR5

Digital Realty · Paris, France

3.465 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
UltraEdge logo

UltraEdge Bordeaux

UltraEdge · Bordeaux, France

3.114 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
UltraEdge logo

UltraEdge Lyon-Venissieux

UltraEdge · Vénissieux, Auvergne-Rhône-Alpes, France

2.987 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Small colo
Active
Page 1 of 10
Next →
💼

Powering the Future Starts with People

Discover careers in the data center industry.

Explore Jobs on Racks & Rows →

Job alerts are coming — join the waitlist

We're building job alerts for the data center industry. Leave your email and we'll tell you the moment they go live. Free, unsubscribe any time.

Browse by Region

  • Northern Virginia
  • Dublin
  • London
  • Frankfurt
  • Amsterdam
  • Paris

Filters