
20.213MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
231Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
49.9dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix BX1 - Bordeaux is a 20.213 MW (est.) data center in Bruges, Bordeaux, France operated by Equinix, currently operational. Estimated water use is about 230,675 gal/day.
Last updated: July 25, 2026
- IT Power Capacity
- 20.213 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 230,675 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-25
Frequently asked questions
- What is Equinix BX1 - Bordeaux?
- Equinix BX1 - Bordeaux is a 20.213 MW (est.) data center in Bruges, Bordeaux, France operated by Equinix, currently operational. Estimated water use is about 230,675 gal/day.
- Where is Equinix BX1 - Bordeaux located?
- Equinix BX1 - Bordeaux is located in Bruges, Bordeaux, France.
- Who operates Equinix BX1 - Bordeaux?
- Equinix BX1 - Bordeaux is operated by Equinix.
- How big is Equinix BX1 - Bordeaux?
- Equinix BX1 - Bordeaux has an IT power capacity of 20.213 MW. This figure is estimated.
- Is Equinix BX1 - Bordeaux operational?
- Yes — Equinix BX1 - Bordeaux is currently operational.
- How much water does Equinix BX1 - Bordeaux use?
- Equinix BX1 - Bordeaux has an estimated water use of about 230,675 gallons per day.