3.114MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
36Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
41.7dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
UltraEdgeOperator
About this facility
UltraEdge Bordeaux is a 3.114 MW (est.) data center in Bordeaux, France operated by UltraEdge, currently operational. Estimated water use is about 35,538 gal/day.
Previously SFR
Last updated: July 24, 2026
- IT Power Capacity
- 3.114 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 35,538 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is UltraEdge Bordeaux?
- UltraEdge Bordeaux is a 3.114 MW (est.) data center in Bordeaux, France operated by UltraEdge, currently operational. Estimated water use is about 35,538 gal/day.
- Where is UltraEdge Bordeaux located?
- UltraEdge Bordeaux is located in Bordeaux, France.
- Who operates UltraEdge Bordeaux?
- UltraEdge Bordeaux is operated by UltraEdge.
- How big is UltraEdge Bordeaux?
- UltraEdge Bordeaux has an IT power capacity of 3.114 MW. This figure is estimated.
- Is UltraEdge Bordeaux operational?
- Yes — UltraEdge Bordeaux is currently operational.
- How much water does UltraEdge Bordeaux use?
- UltraEdge Bordeaux has an estimated water use of about 35,538 gallons per day.