Data Center List

Discover, analyze, and understand the impact of data centers worldwide.

Explore

  • Explore map
  • Browse data centers
  • Operators
  • Add a data center

Top markets

  • Northern Virginia
  • Dublin
  • London
  • Frankfurt
  • Amsterdam
  • Paris

By status

  • Operational
  • Planned
  • Under construction

Stats & Research

  • Stats & research
  • Insights
  • Largest data centers
  • Water usage
  • Power consumption
  • Noise levels
  • Jobs created

Resources

  • Data center jobs
  • Sitemap
  • Sign in
  • Terms & data use

© 2026 Data Center List

Data from PeeringDB, OpenStreetMap, Wikidata & public planning records. Values marked est. are estimates.

Data Center List
ExploreData CentersOperatorsNear MeJobs
+ Add Data CenterSign in

Browse Data Centers

6072 facilities worldwide

6072 facilities

PowerNameStatus
Element Critical, LLC logo

Element Critical Northern Virginia VA1

Element Critical, LLC · Vienna, VA, United States

5.987 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Equinix logo

Equinix LD4 - London, Slough

Equinix · Slough, United Kingdom

5.964 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
EX

Expedient Phoenix

Expedient · Phoenix, AZ, United States

5.958 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Borealis Data Center logo

Blönduós Campus

Borealis Data Center · Blönduós, Iceland

5.93 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Fujitsu Australia Limited logo

Fujitsu North Ryde

Fujitsu Australia Limited · Macquarie Park, NSW, Australia

5.919 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Global Switch logo

Global Switch Frankfurt

Global Switch · Frankfurt, Germany

5.867 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
ANTEL logo

Data Center Internacional Ingeniero Jose Luis Massera

ANTEL · Pando, Canelones, Uruguay

5.837 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Digital Realty logo

Digital Realty Paris PAR8

Digital Realty · La Courneuve, France

5.834 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Equinix logo

Equinix SY1/SY2 - Sydney

Equinix · Sydney, NSW, Australia

5.821 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Bulk Infrastructure AS logo

Bulk Oslo Internet Exchange - OS-IX

Bulk Infrastructure AS · Oslo, Norway

5.798 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Lumen Technologies Inc logo

Level(3) Sunnyvale

Lumen Technologies Inc · Sunnyvale, CA, United States

5.795 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Flexential Corp. logo

Flexential - Atlanta/Alpharetta (ATL3/4)

Flexential Corp. · Alpharetta, GA, United States

5.723 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
NorthC Deutschland GmbH logo

NorthC Frankfurt 3

NorthC Deutschland GmbH · Frankfurt am Main, Germany

5.688 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Equinix logo

Equinix SK2 - Stockholm, Sköndal

Equinix · Stockholm, Sweden

5.665 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
VI

Virtus LONDON8

Virtus · United Kingdom

5.651 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Flexential Corp. logo

Flexential - Nashville/Franklin (NAS05/06)

Flexential Corp. · Franklin, TN, United States

5.632 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
CoreSite logo

CoreSite - Atlanta (AT2)

CoreSite · Marietta, GA, United States

5.626 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
POST Telecom S.A. logo

DEEP Resilience Centre Luxembourg South

POST Telecom S.A. · Kayl, Luxembourg

5.598 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
T5

T5@Colorado Springs

T5 Data Centers · Colorado Springs, CO, United States

5.581 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
RagingWire Data Centers - NTT logo

RagingWire VA2 - NTT

RagingWire Data Centers - NTT · Ashburn, VA, United States

5.573 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Flexential Corp. logo

Flexential - Fort Lauderdale (FLL1/2)

Flexential Corp. · Fort Lauderdale, FL, United States

5.541 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
NorthC Datacenters logo

NorthC Aalsmeer

NorthC Datacenters · Aalsmeer, Noord-Holland, Netherlands

5.527 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Equinix logo

Equinix AM1/AM2 - Amsterdam, Luttenbergweg

Equinix · Amsterdam, Netherlands

5.475 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Green Mountain AS logo

DC3-Oslo

Green Mountain AS · Ytre Enebakk, Norway

5.474 MW ITAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Mid-size facility
Active
Page 16 of 253
← PrevNext →
💼

Powering the Future Starts with People

Discover careers in the data center industry.

Explore Jobs on Racks & Rows →

Job alerts are coming — join the waitlist

We're building job alerts for the data center industry. Leave your email and we'll tell you the moment they go live. Free, unsubscribe any time.

Browse by Region

  • Northern Virginia
  • Dublin
  • London
  • Frankfurt
  • Amsterdam
  • Paris

Filters