
7.348MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
84Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
45.5dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
MERLIN EdgedOperator
About this facility
MERLIN Edged BIL03 - Bilbao-Arasur is a 7.348 MW (est.) data center in Rivabellosa, Álava, Spain operated by MERLIN Edged, currently operational. Estimated water use is about 83,857 gal/day.
MERLIN Edged facilities are AI-ready with air, liquid and hybrid cooling solutions.
Last updated: July 25, 2026
- IT Power Capacity
- 7.348 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 83,857 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-25
Frequently asked questions
- What is MERLIN Edged BIL03 - Bilbao-Arasur?
- MERLIN Edged BIL03 - Bilbao-Arasur is a 7.348 MW (est.) data center in Rivabellosa, Álava, Spain operated by MERLIN Edged, currently operational. Estimated water use is about 83,857 gal/day.
- Where is MERLIN Edged BIL03 - Bilbao-Arasur located?
- MERLIN Edged BIL03 - Bilbao-Arasur is located in Rivabellosa, Álava, Spain.
- Who operates MERLIN Edged BIL03 - Bilbao-Arasur?
- MERLIN Edged BIL03 - Bilbao-Arasur is operated by MERLIN Edged.
- How big is MERLIN Edged BIL03 - Bilbao-Arasur?
- MERLIN Edged BIL03 - Bilbao-Arasur has an IT power capacity of 7.348 MW. This figure is estimated.
- Is MERLIN Edged BIL03 - Bilbao-Arasur operational?
- Yes — MERLIN Edged BIL03 - Bilbao-Arasur is currently operational.
- How much water does MERLIN Edged BIL03 - Bilbao-Arasur use?
- MERLIN Edged BIL03 - Bilbao-Arasur has an estimated water use of about 83,857 gallons per day.