Active
5.362MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
61Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
44.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Zayo GroupOperator
About this facility
Zayo Cleveland - 1525 Rockwell Ave is a 5.362 MW (est.) data center in Cleveland, OH, United States operated by Zayo Group, currently operational. Estimated water use is about 61,192 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 5.362 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 61,192 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Zayo Cleveland - 1525 Rockwell Ave?
- Zayo Cleveland - 1525 Rockwell Ave is a 5.362 MW (est.) data center in Cleveland, OH, United States operated by Zayo Group, currently operational. Estimated water use is about 61,192 gal/day.
- Where is Zayo Cleveland - 1525 Rockwell Ave located?
- Zayo Cleveland - 1525 Rockwell Ave is located in Cleveland, OH, United States.
- Who operates Zayo Cleveland - 1525 Rockwell Ave?
- Zayo Cleveland - 1525 Rockwell Ave is operated by Zayo Group.
- How big is Zayo Cleveland - 1525 Rockwell Ave?
- Zayo Cleveland - 1525 Rockwell Ave has an IT power capacity of 5.362 MW. This figure is estimated.
- Is Zayo Cleveland - 1525 Rockwell Ave operational?
- Yes — Zayo Cleveland - 1525 Rockwell Ave is currently operational.
- How much water does Zayo Cleveland - 1525 Rockwell Ave use?
- Zayo Cleveland - 1525 Rockwell Ave has an estimated water use of about 61,192 gallons per day.