
0.78MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
9Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
35.7dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Vocus GroupOperator
About this facility
Vocus Sydney SYD02 is a 0.78 MW (est.) data center in Baulkham Hills, NSW, Australia operated by Vocus Group, currently operational. Estimated water use is about 8,902 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 0.78 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 8,902 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Vocus Sydney SYD02?
- Vocus Sydney SYD02 is a 0.78 MW (est.) data center in Baulkham Hills, NSW, Australia operated by Vocus Group, currently operational. Estimated water use is about 8,902 gal/day.
- Where is Vocus Sydney SYD02 located?
- Vocus Sydney SYD02 is located in Baulkham Hills, NSW, Australia.
- Who operates Vocus Sydney SYD02?
- Vocus Sydney SYD02 is operated by Vocus Group.
- How big is Vocus Sydney SYD02?
- Vocus Sydney SYD02 has an IT power capacity of 0.78 MW. This figure is estimated.
- Is Vocus Sydney SYD02 operational?
- Yes — Vocus Sydney SYD02 is currently operational.
- How much water does Vocus Sydney SYD02 use?
- Vocus Sydney SYD02 has an estimated water use of about 8,902 gallons per day.