
4.2MWIT Capacity
48Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
43dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
VIRTUS Data CentresOperator
About this facility
VIRTUS LONDON1 (Enfield) is a 4.2 MW data center in London, United Kingdom operated by VIRTUS Data Centres, currently operational. Estimated water use is about 47,931 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 4.2 MW· wikidata
- Water Usage
- 47,931 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
Frequently asked questions
- What is VIRTUS LONDON1 (Enfield)?
- VIRTUS LONDON1 (Enfield) is a 4.2 MW data center in London, United Kingdom operated by VIRTUS Data Centres, currently operational. Estimated water use is about 47,931 gal/day.
- Where is VIRTUS LONDON1 (Enfield) located?
- VIRTUS LONDON1 (Enfield) is located in London, United Kingdom.
- Who operates VIRTUS LONDON1 (Enfield)?
- VIRTUS LONDON1 (Enfield) is operated by VIRTUS Data Centres.
- How big is VIRTUS LONDON1 (Enfield)?
- VIRTUS LONDON1 (Enfield) has an IT power capacity of 4.2 MW.
- Is VIRTUS LONDON1 (Enfield) operational?
- Yes — VIRTUS LONDON1 (Enfield) is currently operational.
- How much water does VIRTUS LONDON1 (Enfield) use?
- VIRTUS LONDON1 (Enfield) has an estimated water use of about 47,931 gallons per day.