0.603MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
7Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
34.6dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
VegacomOperator
About this facility
Vegacom DC is a 0.603 MW (est.) data center in Praha 9 – Střížkov, Czechia operated by Vegacom, currently operational. Estimated water use is about 6,882 gal/day.
Last updated: July 25, 2026
- IT Power Capacity
- 0.603 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 6,882 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-25
Frequently asked questions
- What is Vegacom DC?
- Vegacom DC is a 0.603 MW (est.) data center in Praha 9 – Střížkov, Czechia operated by Vegacom, currently operational. Estimated water use is about 6,882 gal/day.
- Where is Vegacom DC located?
- Vegacom DC is located in Praha 9 – Střížkov, Czechia.
- Who operates Vegacom DC?
- Vegacom DC is operated by Vegacom.
- How big is Vegacom DC?
- Vegacom DC has an IT power capacity of 0.603 MW. This figure is estimated.
- Is Vegacom DC operational?
- Yes — Vegacom DC is currently operational.
- How much water does Vegacom DC use?
- Vegacom DC has an estimated water use of about 6,882 gallons per day.