51.215MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
584Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
53.9dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Vantage Data CentersOperator
About this facility
Vantage Data Centers (QC2) is a 51.215 MW (est.) data center in Quebec, QC, Canada operated by Vantage Data Centers, currently operational. Estimated water use is about 584,477 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 51.215 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 584,477 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Vantage Data Centers (QC2)?
- Vantage Data Centers (QC2) is a 51.215 MW (est.) data center in Quebec, QC, Canada operated by Vantage Data Centers, currently operational. Estimated water use is about 584,477 gal/day.
- Where is Vantage Data Centers (QC2) located?
- Vantage Data Centers (QC2) is located in Quebec, QC, Canada.
- Who operates Vantage Data Centers (QC2)?
- Vantage Data Centers (QC2) is operated by Vantage Data Centers.
- How big is Vantage Data Centers (QC2)?
- Vantage Data Centers (QC2) has an IT power capacity of 51.215 MW. This figure is estimated.
- Is Vantage Data Centers (QC2) operational?
- Yes — Vantage Data Centers (QC2) is currently operational.
- How much water does Vantage Data Centers (QC2) use?
- Vantage Data Centers (QC2) has an estimated water use of about 584,477 gallons per day.