2.241MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
26Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
40.3dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Ada InfrastructureOperator
About this facility
Tokyo West 1 is a 2.241 MW (est.) data center in Tama, Tokyo, Japan operated by Ada Infrastructure, currently operational. Estimated water use is about 25,575 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 2.241 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 25,575 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Tokyo West 1?
- Tokyo West 1 is a 2.241 MW (est.) data center in Tama, Tokyo, Japan operated by Ada Infrastructure, currently operational. Estimated water use is about 25,575 gal/day.
- Where is Tokyo West 1 located?
- Tokyo West 1 is located in Tama, Tokyo, Japan.
- Who operates Tokyo West 1?
- Tokyo West 1 is operated by Ada Infrastructure.
- How big is Tokyo West 1?
- Tokyo West 1 has an IT power capacity of 2.241 MW. This figure is estimated.
- Is Tokyo West 1 operational?
- Yes — Tokyo West 1 is currently operational.
- How much water does Tokyo West 1 use?
- Tokyo West 1 has an estimated water use of about 25,575 gallons per day.