
21.476MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
245Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
50.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
TierPoint, LLCOperator
About this facility
TierPoint Nashville is a 21.476 MW (est.) data center in Franklin, TN, United States operated by TierPoint, LLC, currently operational. Estimated water use is about 245,089 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 21.476 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 245,089 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is TierPoint Nashville?
- TierPoint Nashville is a 21.476 MW (est.) data center in Franklin, TN, United States operated by TierPoint, LLC, currently operational. Estimated water use is about 245,089 gal/day.
- Where is TierPoint Nashville located?
- TierPoint Nashville is located in Franklin, TN, United States.
- Who operates TierPoint Nashville?
- TierPoint Nashville is operated by TierPoint, LLC.
- How big is TierPoint Nashville?
- TierPoint Nashville has an IT power capacity of 21.476 MW. This figure is estimated.
- Is TierPoint Nashville operational?
- Yes — TierPoint Nashville is currently operational.
- How much water does TierPoint Nashville use?
- TierPoint Nashville has an estimated water use of about 245,089 gallons per day.