
3.854MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
44Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
42.7dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
TierPoint, LLCOperator
About this facility
TierPoint Boston - Andover is a 3.854 MW (est.) data center in Andover, MA, United States operated by TierPoint, LLC, currently operational. Estimated water use is about 43,983 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 3.854 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 43,983 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is TierPoint Boston - Andover?
- TierPoint Boston - Andover is a 3.854 MW (est.) data center in Andover, MA, United States operated by TierPoint, LLC, currently operational. Estimated water use is about 43,983 gal/day.
- Where is TierPoint Boston - Andover located?
- TierPoint Boston - Andover is located in Andover, MA, United States.
- Who operates TierPoint Boston - Andover?
- TierPoint Boston - Andover is operated by TierPoint, LLC.
- How big is TierPoint Boston - Andover?
- TierPoint Boston - Andover has an IT power capacity of 3.854 MW. This figure is estimated.
- Is TierPoint Boston - Andover operational?
- Yes — TierPoint Boston - Andover is currently operational.
- How much water does TierPoint Boston - Andover use?
- TierPoint Boston - Andover has an estimated water use of about 43,983 gallons per day.