Thames Valley Park Data Centre
Reading, United Kingdom
72MWIT Capacity
822Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
55.4dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Thames Valley Park Data Centre is a 72 MW data center in Reading, United Kingdom, currently planned. Estimated water use is about 821,681 gal/day.
Proposed 72 MW data center at Thames Valley Park, Reading (Microsoft UK campus redevelopment).
Last updated: July 24, 2026
- IT Power Capacity
- 72 MW· press_release
- Water Usage
- 821,681 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- Data Center Dynamics · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Thames Valley Park Data Centre?
- Thames Valley Park Data Centre is a 72 MW data center in Reading, United Kingdom, currently planned. Estimated water use is about 821,681 gal/day.
- Where is Thames Valley Park Data Centre located?
- Thames Valley Park Data Centre is located in Reading, United Kingdom.
- How big is Thames Valley Park Data Centre?
- Thames Valley Park Data Centre has an IT power capacity of 72 MW.
- Is Thames Valley Park Data Centre operational?
- Thames Valley Park Data Centre is currently planned. Milestone dates are sourced from public planning records as they become available.
- How much water does Thames Valley Park Data Centre use?
- Thames Valley Park Data Centre has an estimated water use of about 821,681 gallons per day.