Teraco Johannesburg Campus, South Africa
Johannesburg, GP, South Africa
Operated by Teraco Data Environments Pty Ltd
About this facility
Teraco Johannesburg Campus, South Africa is a 8.435 MW (est.) data center in Johannesburg, GP, South Africa operated by Teraco Data Environments Pty Ltd, currently operational. Estimated water use is about 96,262 gal/day.
Opened in January 2010, JB1 East, the Johannesburg colocation data centre facility was originally set over 1250sqm. Subsequent growth in the market and demand for carrier neutral colocation resulted in further expansion phases that increased the data centre floor space in JB1 East to over 3850sqm and the building of a second facility, JB1 West, which houses over 5000sqm of data centre floor space. A total of 20MVA of power is supplied to the site. Opening February 2020 60 MVA, 12000 sqm cateri…
Last updated: July 24, 2026
- IT Power Capacity
- 8.435 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 96,262 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Teraco Johannesburg Campus, South Africa?
- Teraco Johannesburg Campus, South Africa is a 8.435 MW (est.) data center in Johannesburg, GP, South Africa operated by Teraco Data Environments Pty Ltd, currently operational. Estimated water use is about 96,262 gal/day.
- Where is Teraco Johannesburg Campus, South Africa located?
- Teraco Johannesburg Campus, South Africa is located in Johannesburg, GP, South Africa.
- Who operates Teraco Johannesburg Campus, South Africa?
- Teraco Johannesburg Campus, South Africa is operated by Teraco Data Environments Pty Ltd.
- How big is Teraco Johannesburg Campus, South Africa?
- Teraco Johannesburg Campus, South Africa has an IT power capacity of 8.435 MW. This figure is estimated.
- Is Teraco Johannesburg Campus, South Africa operational?
- Yes — Teraco Johannesburg Campus, South Africa is currently operational.
- How much water does Teraco Johannesburg Campus, South Africa use?
- Teraco Johannesburg Campus, South Africa has an estimated water use of about 96,262 gallons per day.