TelemaxX IPC5

Stutensee, Germany

Operated by TelemaxX Telekommunikation GmbH

Active
1.804MWAI est.IT Capacity
21Kgal/dayAI est.Water
39.4dB(A)AI est.Est. Noise
TelemaxX Telekommunikation GmbHOperator

About this facility

TelemaxX IPC5 is a 1.804 MW (est.) data center in Stutensee, Germany operated by TelemaxX Telekommunikation GmbH, currently operational. Estimated water use is about 20,588 gal/day.

Last updated: July 24, 2026

IT Power Capacity
1.804 MWAI est.
Water Usage
20,588 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is TelemaxX IPC5?
TelemaxX IPC5 is a 1.804 MW (est.) data center in Stutensee, Germany operated by TelemaxX Telekommunikation GmbH, currently operational. Estimated water use is about 20,588 gal/day.
Where is TelemaxX IPC5 located?
TelemaxX IPC5 is located in Stutensee, Germany.
Who operates TelemaxX IPC5?
TelemaxX IPC5 is operated by TelemaxX Telekommunikation GmbH.
How big is TelemaxX IPC5?
TelemaxX IPC5 has an IT power capacity of 1.804 MW. This figure is estimated.
Is TelemaxX IPC5 operational?
Yes — TelemaxX IPC5 is currently operational.
How much water does TelemaxX IPC5 use?
TelemaxX IPC5 has an estimated water use of about 20,588 gallons per day.

Data for TelemaxX IPC5 sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore