Active
1.804MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
21Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
39.4dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
TelemaxX Telekommunikation GmbHOperator
About this facility
TelemaxX IPC5 is a 1.804 MW (est.) data center in Stutensee, Germany operated by TelemaxX Telekommunikation GmbH, currently operational. Estimated water use is about 20,588 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 1.804 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 20,588 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is TelemaxX IPC5?
- TelemaxX IPC5 is a 1.804 MW (est.) data center in Stutensee, Germany operated by TelemaxX Telekommunikation GmbH, currently operational. Estimated water use is about 20,588 gal/day.
- Where is TelemaxX IPC5 located?
- TelemaxX IPC5 is located in Stutensee, Germany.
- Who operates TelemaxX IPC5?
- TelemaxX IPC5 is operated by TelemaxX Telekommunikation GmbH.
- How big is TelemaxX IPC5?
- TelemaxX IPC5 has an IT power capacity of 1.804 MW. This figure is estimated.
- Is TelemaxX IPC5 operational?
- Yes — TelemaxX IPC5 is currently operational.
- How much water does TelemaxX IPC5 use?
- TelemaxX IPC5 has an estimated water use of about 20,588 gallons per day.