Active
1.423MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
16Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
38.3dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
TelemaxX Telekommunikation GmbHOperator
About this facility
TelemaxX IPC4 is a 1.423 MW (est.) data center in Karlsruhe, Germany operated by TelemaxX Telekommunikation GmbH, currently operational. Estimated water use is about 16,240 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 1.423 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 16,240 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is TelemaxX IPC4?
- TelemaxX IPC4 is a 1.423 MW (est.) data center in Karlsruhe, Germany operated by TelemaxX Telekommunikation GmbH, currently operational. Estimated water use is about 16,240 gal/day.
- Where is TelemaxX IPC4 located?
- TelemaxX IPC4 is located in Karlsruhe, Germany.
- Who operates TelemaxX IPC4?
- TelemaxX IPC4 is operated by TelemaxX Telekommunikation GmbH.
- How big is TelemaxX IPC4?
- TelemaxX IPC4 has an IT power capacity of 1.423 MW. This figure is estimated.
- Is TelemaxX IPC4 operational?
- Yes — TelemaxX IPC4 is currently operational.
- How much water does TelemaxX IPC4 use?
- TelemaxX IPC4 has an estimated water use of about 16,240 gallons per day.