Active
28.564MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
326Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
51.4dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
T5 Data CentersOperator
About this facility
T5@Charlotte is a 28.564 MW (est.) data center in Kings Mountain, NC, United States operated by T5 Data Centers, currently operational. Estimated water use is about 325,979 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 28.564 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 325,979 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is T5@Charlotte?
- T5@Charlotte is a 28.564 MW (est.) data center in Kings Mountain, NC, United States operated by T5 Data Centers, currently operational. Estimated water use is about 325,979 gal/day.
- Where is T5@Charlotte located?
- T5@Charlotte is located in Kings Mountain, NC, United States.
- Who operates T5@Charlotte?
- T5@Charlotte is operated by T5 Data Centers.
- How big is T5@Charlotte?
- T5@Charlotte has an IT power capacity of 28.564 MW. This figure is estimated.
- Is T5@Charlotte operational?
- Yes — T5@Charlotte is currently operational.
- How much water does T5@Charlotte use?
- T5@Charlotte has an estimated water use of about 325,979 gallons per day.