
2.824MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
32Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
41.3dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Schwarz IT KGOperator
About this facility
STACKIT Ostermiething (DC10) is a 2.824 MW (est.) data center in Ostermiething, Austria operated by Schwarz IT KG, currently operational. Estimated water use is about 32,228 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 2.824 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 32,228 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is STACKIT Ostermiething (DC10)?
- STACKIT Ostermiething (DC10) is a 2.824 MW (est.) data center in Ostermiething, Austria operated by Schwarz IT KG, currently operational. Estimated water use is about 32,228 gal/day.
- Where is STACKIT Ostermiething (DC10) located?
- STACKIT Ostermiething (DC10) is located in Ostermiething, Austria.
- Who operates STACKIT Ostermiething (DC10)?
- STACKIT Ostermiething (DC10) is operated by Schwarz IT KG.
- How big is STACKIT Ostermiething (DC10)?
- STACKIT Ostermiething (DC10) has an IT power capacity of 2.824 MW. This figure is estimated.
- Is STACKIT Ostermiething (DC10) operational?
- Yes — STACKIT Ostermiething (DC10) is currently operational.
- How much water does STACKIT Ostermiething (DC10) use?
- STACKIT Ostermiething (DC10) has an estimated water use of about 32,228 gallons per day.