
1.907MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
22Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
39.6dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
ServerHouseOperator
About this facility
ServerHouse F2 is a 1.907 MW (est.) data center in Fareham, Hampshire, United Kingdom operated by ServerHouse, currently operational. Estimated water use is about 21,763 gal/day.
ServerHouse's 4th Datacentre, Fareham 2, 22,000 sq/ft Tier III space
Last updated: July 24, 2026
- IT Power Capacity
- 1.907 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 21,763 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is ServerHouse F2?
- ServerHouse F2 is a 1.907 MW (est.) data center in Fareham, Hampshire, United Kingdom operated by ServerHouse, currently operational. Estimated water use is about 21,763 gal/day.
- Where is ServerHouse F2 located?
- ServerHouse F2 is located in Fareham, Hampshire, United Kingdom.
- Who operates ServerHouse F2?
- ServerHouse F2 is operated by ServerHouse.
- How big is ServerHouse F2?
- ServerHouse F2 has an IT power capacity of 1.907 MW. This figure is estimated.
- Is ServerHouse F2 operational?
- Yes — ServerHouse F2 is currently operational.
- How much water does ServerHouse F2 use?
- ServerHouse F2 has an estimated water use of about 21,763 gallons per day.