Seinäjoki AI campus (SJK01)
Seinäjoki, South Ostrobothnia, Finland
550MWIT Capacity
6.3Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
64.2dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Seinäjoki AI campus (SJK01) is a 550 MW data center in Seinäjoki, South Ostrobothnia, Finland, currently planned. Estimated water use is about 6,276,727 gal/day.
Pure DC, a UK company backed by Oaktree, began construction in spring 2026 of the SJK01 AI data center campus in Seinäjoki, Finland. Phase 1 is about €1.5 billion and 110 MW of IT capacity, already fully leased, with Microsoft reportedly the tenant; the campus could scale beyond 550 MW and €7.5 billion.
Last updated: November 15, 2026
- IT Power Capacity
- 550 MW· research_agent
- Water Usage
- 6,276,727 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- puredc.com · retrieved 2026-11-14
- datacenterdynamics.com · retrieved 2026-11-14
- puredc.com · retrieved 2026-11-14
- borenius.com · retrieved 2026-11-14
- puredc.com · retrieved 2026-11-14
- yle.fi · retrieved 2026-11-14
- AI Estimate · retrieved 2026-11-15
Frequently asked questions
- What is Seinäjoki AI campus (SJK01)?
- Seinäjoki AI campus (SJK01) is a 550 MW data center in Seinäjoki, South Ostrobothnia, Finland, currently planned. Estimated water use is about 6,276,727 gal/day.
- Where is Seinäjoki AI campus (SJK01) located?
- Seinäjoki AI campus (SJK01) is located in Seinäjoki, South Ostrobothnia, Finland.
- How big is Seinäjoki AI campus (SJK01)?
- Seinäjoki AI campus (SJK01) has an IT power capacity of 550 MW.
- Is Seinäjoki AI campus (SJK01) operational?
- Seinäjoki AI campus (SJK01) is currently planned. Milestone dates are sourced from public planning records as they become available.
- How much water does Seinäjoki AI campus (SJK01) use?
- Seinäjoki AI campus (SJK01) has an estimated water use of about 6,276,727 gallons per day.