
2.889MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
33Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
41.4dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Sabey Data CentersOperator
About this facility
Sabey Intergate East Building 4 is a 2.889 MW (est.) data center in Tukwila, WA, United States operated by Sabey Data Centers, currently operational. Estimated water use is about 32,970 gal/day.
fka: Telx SEA1 fka: Digital Realty
Last updated: July 24, 2026
- IT Power Capacity
- 2.889 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 32,970 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Sabey Intergate East Building 4?
- Sabey Intergate East Building 4 is a 2.889 MW (est.) data center in Tukwila, WA, United States operated by Sabey Data Centers, currently operational. Estimated water use is about 32,970 gal/day.
- Where is Sabey Intergate East Building 4 located?
- Sabey Intergate East Building 4 is located in Tukwila, WA, United States.
- Who operates Sabey Intergate East Building 4?
- Sabey Intergate East Building 4 is operated by Sabey Data Centers.
- How big is Sabey Intergate East Building 4?
- Sabey Intergate East Building 4 has an IT power capacity of 2.889 MW. This figure is estimated.
- Is Sabey Intergate East Building 4 operational?
- Yes — Sabey Intergate East Building 4 is currently operational.
- How much water does Sabey Intergate East Building 4 use?
- Sabey Intergate East Building 4 has an estimated water use of about 32,970 gallons per day.