
3.086MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
35Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
41.7dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Retelit S.p.A.Operator
About this facility
Retelit Avalon 3 is a 3.086 MW (est.) data center in Milan, Lombardia, Italy operated by Retelit S.p.A., currently operational. Estimated water use is about 35,218 gal/day.
Avalon 3 is the new hyper-connected and sustainable IRIDEOS data center in Milan. Certified ANSI/TIA 942 – Rated 4 and Uptime Institute – Tier IV.
Last updated: July 24, 2026
- IT Power Capacity
- 3.086 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 35,218 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Retelit Avalon 3?
- Retelit Avalon 3 is a 3.086 MW (est.) data center in Milan, Lombardia, Italy operated by Retelit S.p.A., currently operational. Estimated water use is about 35,218 gal/day.
- Where is Retelit Avalon 3 located?
- Retelit Avalon 3 is located in Milan, Lombardia, Italy.
- Who operates Retelit Avalon 3?
- Retelit Avalon 3 is operated by Retelit S.p.A..
- How big is Retelit Avalon 3?
- Retelit Avalon 3 has an IT power capacity of 3.086 MW. This figure is estimated.
- Is Retelit Avalon 3 operational?
- Yes — Retelit Avalon 3 is currently operational.
- How much water does Retelit Avalon 3 use?
- Retelit Avalon 3 has an estimated water use of about 35,218 gallons per day.