
2.703MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
31Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
41.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
PulsantOperator
About this facility
Pulsant Croydon LN-1 is a 2.703 MW (est.) data center in Croydon, United Kingdom operated by Pulsant, currently operational. Estimated water use is about 30,847 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 2.703 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 30,847 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Pulsant Croydon LN-1?
- Pulsant Croydon LN-1 is a 2.703 MW (est.) data center in Croydon, United Kingdom operated by Pulsant, currently operational. Estimated water use is about 30,847 gal/day.
- Where is Pulsant Croydon LN-1 located?
- Pulsant Croydon LN-1 is located in Croydon, United Kingdom.
- Who operates Pulsant Croydon LN-1?
- Pulsant Croydon LN-1 is operated by Pulsant.
- How big is Pulsant Croydon LN-1?
- Pulsant Croydon LN-1 has an IT power capacity of 2.703 MW. This figure is estimated.
- Is Pulsant Croydon LN-1 operational?
- Yes — Pulsant Croydon LN-1 is currently operational.
- How much water does Pulsant Croydon LN-1 use?
- Pulsant Croydon LN-1 has an estimated water use of about 30,847 gallons per day.