
3.138MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
36Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
41.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Proximus NVOperator
About this facility
Proximus Netcenter 2 is a 3.138 MW (est.) data center in Machelen, Flanders, Belgium operated by Proximus NV, currently operational. Estimated water use is about 35,812 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 3.138 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 35,812 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Proximus Netcenter 2?
- Proximus Netcenter 2 is a 3.138 MW (est.) data center in Machelen, Flanders, Belgium operated by Proximus NV, currently operational. Estimated water use is about 35,812 gal/day.
- Where is Proximus Netcenter 2 located?
- Proximus Netcenter 2 is located in Machelen, Flanders, Belgium.
- Who operates Proximus Netcenter 2?
- Proximus Netcenter 2 is operated by Proximus NV.
- How big is Proximus Netcenter 2?
- Proximus Netcenter 2 has an IT power capacity of 3.138 MW. This figure is estimated.
- Is Proximus Netcenter 2 operational?
- Yes — Proximus Netcenter 2 is currently operational.
- How much water does Proximus Netcenter 2 use?
- Proximus Netcenter 2 has an estimated water use of about 35,812 gallons per day.